Experience Group No. 1: Clinical Hyperbaric Facilities,

Current and Completed Major Projects

(Multiplace Facilities are Highlighted with Bold Type)

 

Facility/Organization

Size

Type of Project

Completion Date

Oxygen Therapy Chamber, Brooks Air Force Base, San Antonio, TX

10 place

Safety survey.

1975

Hyperbaric Medicine Facility, Veterans Administration, Hospital, Buffalo, NY

4 place

Safety survey.

Chamber modifications.

1976

1976

Hyperbaric Treatment Facility, Southwest Texas Methodist Hospital, San Antonio, TX

8 place

Chamber modification and installation. Fabrication drawings for all support systems.

1978

Hyperbaric Treatment Facility University of Texas Medical Branch Galveston, TX

10 place

Chamber modification and installation. Fabrication drawings for all support systems.

1979

Wright Patterson Clinical Hyperbaric Facility

Wright Patterson Air Force Base, Dayton, OH

28 place

Design of entire facility including the pressure vessels.

Review of construction documents.

Finite Element Analysis of pressure vessels.

Construction support and certification test plan.

1982

 

1985

1985

 

1986

New York University Medical Center Clinical Hyperbaric Facility, New York, NY

10 place

Facility de-installation and packaging for  relocation to a new site.

 

1982

Central Texas Hyperbaric Center Austin, TX

2 place

Design of the entire facility including the pressure vessels.

1983

Clinical Hyperbaric Facility

Royal Saudi Naval Forces General Hospital, Jubail, Saudi Arabia

4 place

Facility design review and post-installation inspection.

1985

Minneapolis Medical Research Foundation, Minneapolis, MN

30 place

Safety survey of existing facility

1983

David Grant Clinical Hyperbaric Facility

Travis Air Force Base, CA

28 place

Design of entire facility including the pressure vessels.

Review of construction documents.

1986

 

1990

Lafayette Home Hospital,

Lafayette, IN

1 place

Feasibility study.

1984

Virginia-Mason Hospital,

Seattle, WA

6 place

Design of fire suppression System.

Design of lighting system.

1984

1985

Mercy San Juan Hospital Carmichael, CA

1 place

Investigation of intrinsically safe circuits

1984

Maryland Institute of Emergency Medicine Services, Baltimore, MD

20 place

System engineering support.

Safety survey of existing facility.

1985

1985

Facility/Organization

Size

Type of Project

Completion Date

Kettering Medical Center

Kettering, OH

1 place

Feasibility study.

1984

Wright Patterson Clinical Hyperbaric Facility

Wright Patterson Air Force Base, Dayton, OH

28 place

O&M manual.

1987

Armed Forces Institute of Pathology Hyperbaric Research Facility Walter Reed Army Medical Center, Washington,  DC

10 place

Design and construction of entire facility including the pressure vessels.

User training.

RSI Model 9608D

1987

 

1988

Lutheran General Hospital,

Park Ridge, IL

10 place

Safety survey of existing facility.

Overhaul and update of entire facility.

1987

1988

Chesapeake Division, Naval Facilities Engineering Command, Washington, DC

All sizes

Optimization of HBO chamber overboard dump system.

1987

Presbyterian-University Hospital, Pittsburgh, PA  

1 place

Provision of 2 monoplace chambers with air conversion kits and a VesTemp Patient Comfort System.

1987

 

NASA, Johnson Space Flight Center, Houston, TX

2 place

Design Safety Review Committee for the space station hyperbaric chamber.

1987-1990

Various

1 place

Relocation of 15 monoplace chambers.

1986-1993

Various

1 place

Development of VesTemp Patient Comfort System.

1987

Various

1 place

Development of safe gas selection panel.

1987

Various

1 place

Development of an air filtration system for monoplace hyperbaric chambers.

1990

Edgewater Hospital, Chicago, IL

12 place

Safety survey of existing facility.

1988

Medical Center Hospital,

Conroe, TX

 

RSI Model  9612D

12 place

Design and construction of entire facility including vessel, systems, training, manuals and all necessary software.

1991

Emergency Treatment Chamber Naval Medical Research Institute

8 place

Design of all piping and instrumentation systems for construction by user personnel.

1991

Portsmouth Naval Hospital Hyperbaric Facility Portsmouth Naval Base, VA

28 place

Design of Entire Facility Including the Pressure Vessels.

1992

Shands Hospital 

University of Florida

Gainesville, FL

8 place

PVHO window replacement, communications upgrade and related items.

1992

St. Joseph's Hospital,

Tampa, FL

6 place

Complete facility installation including refurbishment of an existing vessel and design and construction of all associated systems.

1993

LifeForce,

Baltimore, MD

RSI Model 8406S

6 place

Complete facility installation including vessel, system, training, manuals and all necessary software.

1993

Facility/Organization

Size

Type of Project

Completion Date

Radnic Co.

(for export to Chile)

2 place

Complete system built around an existing PVHO Vessel.

1994

AmHealth Inc.,

Brownsville, TX

Multiple 1 place

Fabrication & installation of air ventilation equipment for 3 oxygen monoplace chambers.

1995

Health Restoration Center

Multiple 1 place

Installation of 5 monoplace chambers.

1995

AmHealth Inc.,

Corpus Christi, TX

Multiple

1 place

Fabrication & installation of air ventilation equipment for 3 oxygen monoplace chambers.

1996

Augusta Regional Medical Center,

Augusta, GA

2 place

Fabrication & installation of replacement PVHO windows for a Reneau Model E-1 HBO chamber.

1996

Holmes Regional Medical Center,

Melbourne, FL

1 place

Fabrication & installation of replacement PVHO window for a Perry Model Sigma 1 HBO chamber.

1996

Hyperbaric Oxygen Clinic of Nevada, Reno, NV

Multiple

1 place

Site design.

Fabrication & installation of liquid cylinder oxygen supply system for 2 oxygen monoplace chambers.

1996

Mission Hospital,

Mission, TX

Multiple

1 place

Site design.

Fabrication & installation of air ventilation equipment for 3 oxygen monoplace chambers.

1996

Ft. Duncan Medical Center,

Eagle Pass, TX

Multiple

1 place

Site design,

Fabrication & installation of air ventilation equipment for 3 oxygen monoplace chambers.

1996

Park Place & Mid-Jefferson Hospitals

Port Arthur, TX

Multiple

1 place

Site design.

Fabrication & installation of air ventilation equipment for 4 oxygen monoplace chambers.

1996

Hyperbaric Oxygen Clinic of Tennessee,

Johnson City, TN

Multiple

1 place

Site design.

Fabrication & installation of air ventilation equipment for 3 oxygen monoplace chambers.

1997

Bloomington Hospital,

Bloomington, IN

Multiple

1 place

Fabrication & installation of air ventilation equipment for 2 oxygen monoplace chambers.

1997

Columbia Medical Arts Hospital,

Texarkana, TX

Multiple

1 place

Site design for a 3 chamber site based on conventional oxygen ventilation monoplace chambers.

1997

Memorial Medical Center, Martinsville, VA

Multiple

1 place

Fabrication & installation of air ventilation equipment for 2 oxygen monoplace chambers.

1998

Facility/Organization

Size

Type of Project

Completion Date

Hyperbaric Oxygen Clinic of Santa Monica,

Santa Monica, CA

Multiple

1 place

Site design, fabrication & installation: liquid cylinder oxygen supply system for  2 oxygen ventilation monoplace chambers

 

Executive Medical Health Group,

Brooklyn, NY, NY

Multiple

1 place

Site design, fabrication & installation: liquid cylinder oxygen supply system for  2 oxygen ventilation monoplace chambers

1998

Chesapeake General Hospital,

Chesapeake, VA

Multiple

1 place

Design of required upgrades to hospital oxygen system.

1998

Miller Institute

Fountain Valley, CA

Multiple

1 place

Site design, fabrication & installation: liquid cylinder oxygen supply system for  2 oxygen ventilation monoplace chambers

1998

Christus Spohn Health Systems

Corpus Christi, TX

Multiple

1 place

Fabrication & installation of air ventilation equipment for 3 oxygen monoplace chambers.

1999

Comprehensive Health Clinic